Join our
LinkedIn Group


Videos

Banc of California Stadium progress

After 10 months of construction, Los Angeles FC has put together a video of progress on the Banc of California Stadium.

Click image to view video

Turner Field sign removed from Georgia State University stadium

Reporters from WSB captured the moment that the famed Turner Field sign was removed from Georgia State University’s football stadium.

Click image to view video

Industry Opinion

« back to blog listings

Looking back

The Rio 2016 Olympics has brought about a twinge of nostalgia for many of us at Movement Strategies. We were heavily involved in planning and delivering the London 2012 Games between 2006 and the last day of the Paralympic Games, playing a significant role in the planning and design of the venues and infrastructure, event day operations and transport.

This article describes some aspects of the crowd movement and transport planning undertaken by Movement Strategies that helped to deliver the successful London 2012 Games.

Demand forecasting
An important activity in planning for crowd movement was the development and management of the spectator demand forecasts for the Olympic Park – a task which Movement Strategies undertook on behalf of the Olympic Delivery Authority. The forecasts were central to determining the size (and build cost) and design of the Olympic Park, and planning Games transport.

Event overlay design
The forecasts were used in determining the footprint required for security screening, and the number and configuration of ‘Mag and Bag’ screening units needed. We tested this using spreadsheets, and later crowd simulations, to undertake scenario and sensitivity analysis to ensure the security screening areas could process the peak spectator flows while being as cost-effective as possible. The security screening areas at London 2012 worked as planned with small queues and low wait times while maintaining a strict security regime.

The demand forecasts were also used to optimize the number of toilets and food and beverage points to give the specified performance for visitor experience. Free water points were also implemented to reduce queues at the F&B points and to avoid fans having to wait for long periods to buy a bottle of water, as has been observed at Rio and previous Games.

Transport planning and operations
Government and transport organizations came together in a way never achieved before to meet the challenge of transporting spectators and athletes. We supported ODA Transport, Transport for London, Network Rail and LOCOG in planning and delivering the Games transport.

The rail network was critical to the success of the Olympics, with 80% of spectators predicted to access the venues and venue clusters by rail. Rail line and station capacity studies, based on the demand forecasts, were undertaken to understand the stations and predict the times where capacity was insufficient to meet both Games and business-as-usual demand.

A Travel Demand Management program (TDM) was undertaken by the Games organizers and transport network operators, and was hugely successful. It encouraged commuters to change their travel behavior during the Games to avoid peak times and stations at which higher than normal congestion was forecast and to help reduce the burden on services.

Even after the impact of TDM there were key stations, such as London Bridge, St Pancras International and Stratford, where the level of demand would overwhelm the stations if they were operated as normal. Movement Strategies helped develop and test event day operations plans (overlays) for these key stations to accommodate the additional demand. For the most critical stations, dynamic simulation was undertaken to provide more sophisticated analysis, and validated against real-life observations. The operational plans were then tested to refine the strategy and identify any issues that could affect successful implementation.

One of the stations with an event day plan was London Bridge (above). The transport links and close proximity of Cannon Street and Charing Cross to London Bridge meant that redirecting spectators going to Greenwich Park and commuters to these stations instead of London Bridge would result in travel time savings. One-way crowd flow and queuing systems were also implemented inside and outside the station to increase flows and reduce congestion.

Crowd management plans were also developed at St Pancras International station, where our recommendation to pre-load the platforms was critical to the success of the Javelin service, which moved people quickly between central London and the Olympic Park.

The unknown element of rail delays was factored into the models and monitored throughout the Games by a team of transport operators so they could quickly react to any situations that arose.

Live analytics
The final piece of the jigsaw. Movement Strategies was part of the Games-time Transport Analytics Group and was heavily involved in monitoring the actual arrival and departure patterns of spectators at the Olympic Park throughout each day, including the metro or train line used.

A variety of technologies were combined to measure demand and crowd flows, including Bluetooth monitoring and live ticket scan data. We used these to support operational decision making within venues, on the transport network and in the last mile – between the transport hubs and the venues. The analytics were also used to support the transport stakeholders’ communications with the media, government, Londoners and spectators.

The difference between the forecast and the reality was particularly valuable for multi-day events as it enabled the forecast demand and operational plans to be adjusted in light of the actual outcomes. The combination of a wide range of data collection techniques added to the robustness of this methodology and helped to predict trends that were not accounted for in the pre-Games forecasts.

The London 2012 Games was perceived as a great success, delivering great stages for great sport, a wonderful spectator experience, and keeping London working while hosting the world’s largest and most complex sports event. They were undoubtedly well-resourced, but many aspects of the Games were successful because of the planning and testing behind the scenes including crowd movement and transport planning, in which Movement Strategies played a major part. We continue to be proud of our role in making the London 2012 Games such a success.

August 18, 2016

 

Comments:

There are currently no comments.

If you would like to post a comment about this blog, please click here.
Read Latest Issue

Web Exclusives

Arizona Diamondbacks add urban garden to Chase Field

Vertical urban garden at stadium to provide sustainability and educational opportunities throughout the remainder of the season
Click here to read more



Chelsea FC appoints Ericsson as Stamford Bridge's connected venue partner

Two-year partnership will see the communications specialist design, install and maintain a carrier-grade wi-fi network for fans attending Stamford Bridge stadium.
Click here to read more



Mosaic Stadium opens in Regina, Saskatchewan

New 33,000-seat, multipurpose stadium opens on July 1, and will be the new home for the Canadian Football League’s Saskatchewan Roughriders
Click here to read more



Birmingham reveals indoor arenas for 2022 Commonwealth Games bid

The NEC, Genting Arena, Barclaycard Arena and Symphony Hall will play an important role in the UK city’s bid for the Games. 
Click here to read more



Philips Lighting transforms Parc Olympique Lyonnais stadium with next-generation LED lighting

Home of Olympique Lyonnais is the first stadium in France to use dynamic LED pitch lighting with moving color spots
Click here to read more




Supplier Spotlight

Supplier SpotlightWe are building a list of leading suppliers covering all aspects of the stadia industry. Want to see your company included? Contact john.doherty@ukimediaevents.com for more details.

فروشگاه اینترنتی فروشگاه اینترنتی سیستم همکاری در فروش کانال تلگرام چت روم ماهواره آنلاین اندروید دانلود فیلم فروشگظ;ه اینترنتی

Submit your industry opinion

Industry BlogDo you have an opinion you'd like to share with the stadia community? We'd like to hear your views and opinions on the leading issues shaping the industry. Share your comments by sending up to 500 words to matt.ross@ukimediaevents.com

Submit Your Recruitment Ad

Recruitment AdTo send us your recruitment advertising or to receive information on placing a banner please email john.doherty@ukimediaevents.com