Videos

Wrigley Field renovation time-lapse

chase_center_precast

The Chicago Cubs’ iconic stadium is in the process of an US$750m upgrade and this video shows the progress of the latest phase since October 2017, where club and field box sections have been overhauled.

Click image to view video

Headingly Stadium redevelopment time-lapse

headingley timelapse video

As the £40m (US$56m) upgrade to the home of rugby league side Leeds Rhinos and Yorkshire County Cricket Club progresses, watch the rebuilding of the venue’s South Stand and construction of a new main stand, set to be completed by 2019.

Click image to view video

University of Florida reveal facility upgrades masterplan

florida atheletics new stadium

Gators’ athletics director Scott Stricklin talks through revised plans to upgrade on-campus facilities including a new baseball stadium as part of the US$130m project.

Click image to view video

Once known as the 'Eighth Wonder of the World', the stadium below introduced a world first for sports stadia architecture and kick-started a revolution in design back in 1965. Can you name it?
 


Join our
LinkedIn Group


Web Exclusives

« back to listing

Rio Handball arena to be repurposed for school buildings after Olympic Games

The 12,000-seat Future Arena will be dismantled and components used in the construction of a quartet of state schools in Rio de Janeiro after this summer's Olympic Games. 

 

During the Rio 2016 Olympic and Paralympic Games, the Future Arena will host the handball event. After the Games, according to a release from UK-based AndArchitects, the 12,000-capacity structure will be dismantled and used in the construction of four state schools, contributing to the event’s legacy and benefitting the city of Rio de Janeiro. Three schools will be constructed in Barra da Tijuca and one in Maracanã - each accommodating 500 students – as part of a US$77m legacy project.

The brief for the handball arena was to build something that would contribute to the city of Rio beyond the 2016 Olympics. A first for the Olympics, the venue will make use of an innovative technique called nomadic architecture, thus ensuring that even a temporary structure can leave a lasting legacy. Two thousand Brazilian school children will benefit from this initiative.

The arena will be dismantled and the components transported to four separate locations to be rebuilt into state schools. The main elements that will be reused are the roof, rain-screen cladding, main structural steel elements and disabled ramps, which will form the shells of the four schools. The open nature of the rain screen and external ramp, which contribute to the distinctive architectural language of the arena, will be recognizable in the architecture of the new schools.

LSFG Arquitetos Associados and Oficina de Arquitetos, in collaboration with AndArchitects, provided the design for the handball arena. AndArchitects’ experience with six temporary buildings at London 2012 helped the company jointly win the bid for the project. Careful thought was given to what materials and systems of construction would enable the transition with minimal wasted material. The schools were designed simultaneously with the arena. The grid for the floor plates and the roof were all designed from the outset for both buildings so that the panels on the façade and on the floor and roof could be easily relocated in order for the modules to work for both buildings.

After the Games, once the arena has been converted into schools, the students will be reminded of their schools’ role in the Olympic Games. One idea being reviewed is that the names of the stars of the Brazilian team are engraved onto the cladding of the building and these names will remain on the walls of the classroom.

 

 

 

Images: Leonardo Finotti

July 21, 2016

 

 

RECEIVE THE
LATEST NEWS


Your email address:



Read Latest Issue

Web Exclusives

Behind the scenes at LAFC's brand-new training facility

Take a look inside new MLS franchise Los Angeles FC’s Performance Center, complete with state-of-the-art facilities ahead of the Banc of California Stadium grand opening
Click here to read more



Fast refurb pays off for Orlando

An aggressive deadline and a fixed budget drove the refurbishment of Orlando’s Camping World Stadium – but the venue is already reaping the results.
Click here to read more



Largest US e-sports venue to open in Arlington, Texas

The new 100,000ft² state-of-the-art facility is designed to draw competitive pro video gaming players and fans from around the world.
Click here to read more



Latest renderings of US$600m KeyArena renovation revealed

The public has been given a sneak peak at what to expect from the US$600m renovation plans at the KeyArena in Seattle, Washington, with new renderings released by the Oak View Group showing the 360ft glass atrium and redesigned interior space.
Click here to read more



UMBC's new multi-purpose Event Center a game-changer for students and athletes

The University of Maryland, Baltimore County (UMBC) finally opened the doors to its brand-new multi-purpose Event Center, which has been in construction for over two years at a cost of US$85m.
Click here to read more




Submit your industry opinion

Industry BlogDo you have an opinion you'd like to share with the stadia community? We'd like to hear your views and opinions on the leading issues shaping the industry. Share your comments by sending up to 500 words to matt.ross@ukimediaevents.com

Submit Your Recruitment Ad

Recruitment AdTo send us your recruitment advertising or to receive information on placing a banner please email john.doherty@ukimediaevents.com

Supplier Spotlight

Supplier SpotlightWe are building a list of leading suppliers covering all aspects of the stadia industry. Want to see your company included? Contact john.doherty@ukimediaevents.com for more details.